Upholstery and carpet project: Difference between revisions

From CES IT Wiki
Jump to navigation Jump to search
Added page, intro, and picture of renovations.
 
Added after picture.
 
Line 1: Line 1:
[[File:LL1 renovation.jpg|thumb|right|LL1 during renovations]]
[[File:LL1 renovation.jpg|thumb|right|LL1 during renovations]]
[[File:New LL1 Upholstery.jpg|thumb|right|LL1 after renovations]]
The '''upholstery and carpet project''' was a project to replace the carpeting and seating upholstery in the [[Lower Level Conference Room]] in the summer of 2018.  The previous carpet was in desperate need of replacement since it had built up years of coffee stains and a funky smell.  Students were lax about the no drinks rule in LL1.
The '''upholstery and carpet project''' was a project to replace the carpeting and seating upholstery in the [[Lower Level Conference Room]] in the summer of 2018.  The previous carpet was in desperate need of replacement since it had built up years of coffee stains and a funky smell.  Students were lax about the no drinks rule in LL1.

Latest revision as of 21:14, 14 August 2018

LL1 during renovations
LL1 after renovations

The upholstery and carpet project was a project to replace the carpeting and seating upholstery in the Lower Level Conference Room in the summer of 2018. The previous carpet was in desperate need of replacement since it had built up years of coffee stains and a funky smell. Students were lax about the no drinks rule in LL1.